Swimming pool

Najaf

Build date
2010
Client
Ministry Of Youth
Supervising Executing

The project included filtration and sterilizing of water through a net of piping collecting over flow water and draining the pools.During the sub-structure period , a decision was made to cover the pools and the bleachers building with a steel structure roof , a redesigning was made included adding new columns and additional reinforcement to other existing columns.

Want similar? Contact us!

WHAT YOU CAN EXPECT FROM US

Designed By